Difference between revisions of "Technical Performance Measure (TPM) (glossary)"
m (Text replacement - "<center>'''SEBoK v. 1.9.1, released 16 October 2018'''</center>" to "<center>'''SEBoK v. 2.0, released 1 June 2019'''</center>") |
m (Text replacement - "'''SEBoK v. 2.1, released 31 October 2019'''" to "'''SEBoK v. 2.2, released 15 May 2020'''") |
||
(One intermediate revision by the same user not shown) | |||
Line 13: | Line 13: | ||
[[Category:Glossary of Terms]] | [[Category:Glossary of Terms]] | ||
− | <center>'''SEBoK v. 2. | + | <center>'''SEBoK v. 2.2, released 15 May 2020'''</center> |
Revision as of 08:00, 13 May 2020
(1) Measures of attributes of a system element within the system to determine how well the system or system element is satisfying specified requirements. (Roedler and Jones 2005, 1-65)
(2) A product design assessment, which estimates, through engineering analysis and tests, the values of essential performance parameters of the current design as effected by risk handling actions. (BMP 2012)
Source
(1) Roedler, G. J., and C. Jones. 2005. Technical Measurement: A Collaborative Project of PSM, INCOSE, and Industry. San Diego, CA, USA: Practical Software & Systems Management (PSM)/International Council on Systems Engineering (INCOSE), INCOSE-TP-2003-020-01.
(2) BMP. 2012. "2.8 Risk Monitoring." Accessed September 13, 2012. Available at: http://www.bmpcoe.org/library/books/dsmc%20rmg%204th/69.html.
Discussion
None.