Difference between revisions of "Installation (glossary)"
Jump to navigation
Jump to search
m (Text replacement - "<center>'''SEBoK v. 2.0, released 1 June 2019'''</center>" to "<center>'''SEBoK v. 2.1, released 31 October 2019'''</center>") |
|||
(13 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
− | + | <blockquote>''Period of time in the system life cycle during which a product is integrated into its operational environment and tested in this environment to ensure that it performs as required.'' (Adapted from (ISO/IEC 2009))</blockquote> | |
− | + | ===Source=== | |
− | ISO/IEC. 2009. ''Systems and Software Engineering Vocabulary (SEVocab)'' - ISO/IEC 24765. in International Organization for Standardization (ISO)/International | + | ISO/IEC. 2009. ''Systems and Software Engineering Vocabulary (SEVocab)'' - ISO/IEC 24765. in International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) [database online]. Geneva, Switzerland, 2009 [cited December 21, 2009]. Available from http://pascal.computer.org/sev_display/index.action. |
===Discussion=== | ===Discussion=== | ||
− | + | None. | |
[[Category:Glossary of Terms]] | [[Category:Glossary of Terms]] | ||
+ | <center>'''SEBoK v. 2.1, released 31 October 2019'''</center> |
Revision as of 15:05, 24 October 2019
Period of time in the system life cycle during which a product is integrated into its operational environment and tested in this environment to ensure that it performs as required. (Adapted from (ISO/IEC 2009))
Source
ISO/IEC. 2009. Systems and Software Engineering Vocabulary (SEVocab) - ISO/IEC 24765. in International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) [database online]. Geneva, Switzerland, 2009 [cited December 21, 2009]. Available from http://pascal.computer.org/sev_display/index.action.
Discussion
None.