Difference between revisions of "Enabling System (glossary)"
Jump to navigation
Jump to search
m (Text replacement - "<center>'''SEBoK v. 2.4, released 17 May 2021'''</center>" to "<center>'''SEBoK v. 2.5, released 15 October 2021'''</center>") |
m (Text replacement - "SEBoK v. 2.9, released 13 November 2023" to "SEBoK v. 2.9, released 20 November 2023") |
||
(5 intermediate revisions by one other user not shown) | |||
Line 8: | Line 8: | ||
[[Category:Glossary of Terms]] | [[Category:Glossary of Terms]] | ||
− | <center>'''SEBoK v. 2. | + | <center>'''SEBoK v. 2.9, released 20 November 2023'''</center> |
Latest revision as of 21:58, 18 November 2023
A system that complements a system-of-interest during its life cycle stages, but does not necessarily contribute directly to its function during its operation stage. (INCOSE 2012)
Source
INCOSE. 2012. Systems Engineering Handbook, version 3.2.2. San Diego, CA, USA: International Council on Systems Engineering (INCOSE), INCOSE-TP-2003-002-03.2.2.
Discussion
An enabling system may support a System-of-Interest at any stage of its life. This may include direct maintainence and support systems, test, installation or training systems or project organization enabling systems such as project teams or information resources. See Enabling Systems Engineering.